Kimmy
09-07-2004, 02:13 AM
Looks like the Rockin Robin Timber Sale has sold and timber cutting is going to
begin right away (if it hasn't already started in the last couple of days). If
my maps are correct, this will impact I-5 and the southeast corner of the
Cavannaugh Loop Trails. For those of you that have my "draft" map with the
timber sales on it, you can take a look at the sale location (in green outline)
and the proposed new road locations (heavy black dotted lines) and maybe better
share with everyone else what will be impacted. And remember: the sooner they
start, the sooner they are done.
More to come.
Tom.
Tom Murley
Special Lands Coordinator
NW Region
Department of Natural Resources
919 N. Township St.
Sedro-Woolley, WA 98284
(360) 856-3500
tom.murley@wadnr.gov
begin right away (if it hasn't already started in the last couple of days). If
my maps are correct, this will impact I-5 and the southeast corner of the
Cavannaugh Loop Trails. For those of you that have my "draft" map with the
timber sales on it, you can take a look at the sale location (in green outline)
and the proposed new road locations (heavy black dotted lines) and maybe better
share with everyone else what will be impacted. And remember: the sooner they
start, the sooner they are done.
More to come.
Tom.
Tom Murley
Special Lands Coordinator
NW Region
Department of Natural Resources
919 N. Township St.
Sedro-Woolley, WA 98284
(360) 856-3500
tom.murley@wadnr.gov